KORINstudio

Explore the plan

Pick a topic. Everything opens below.

A proof-led plan to build a premium Indian workwear brand

Four-year executive summary. Korin Studio is pre-launch: there are no sales, samples, signed agreements or customer data yet. Every figure comes from one 48-month model and is a forecast; every term is proposed. Principle: prove the product, prove the economics, prove repeatability, then scale.

Brand proposition

For women in India’s cities who work hard and dress with intent, Korin Studio is architectural, cotton-first workwear that takes her from the boardroom to the city, at ₹1,490 to ₹5,990 a piece, sold on korinstudio.in.

Core customer

The Rising Manager, 28 to 35, metro professional

First six months

A 10-style capsule, about 1,440 pieces, controlled tests, one gate

Stage

Pre-launch. Nothing signed, made or sold

The four years

  • M1–2Phase 0: preparation. Agreements with gate terms, research, samples, costings
  • M1–6Phase 1: proof of concept. Capsule in month 3, controlled selling months 4–6, gate at month 6
  • M7–12Phase 2: optimise, only after PASS or CONDITIONAL PASS
  • M13–24Phase 3: controlled domestic growth
  • M25–36Phase 4: expansion; UAE and UK pilots only behind a gate
  • M37–48Phase 5: scale with discipline

The month-6 gate

Twelve measures, each with a definition, data source, period, owner and the decision taken if it fails. Repeat purchase cannot be observed in six months, so the gate uses repeat intent and reads real cohorts later.

PASS releases the ₹1 crore second tranche. CONDITIONAL PASS opens a cure period. FAIL means redesign and re-test within the remaining cash, or an orderly wind-down. Thresholds are proposals Proposed

Key financial assumptions

Korin Studio management projection [R29]. Factory prices are estimates until open-book sampling. Full model

Four scenarios, one model

₹ crore. Forecasts, not results. The base case is POC-led; the upside is gated on POC results and is not the forecast. The downside is shown with and without the guardrails.

Funding sufficiency

The ₹3 crore is fixed. Where the model shows a gap, the gap is shown, not covered.

Most important unvalidated assumptions

Next milestones